Email

Phone

Search
Close this search box.

Keyport Waterfront Phase 1 – Keyport, NJ

Location: Keyport, NJ

Project: Waterfront Revitalization Project – Phase I

Product: Sheet Piles

Overview: The Borough of Keyport wanted to transform the shoreline protection and public access. SUPERLOC Composite Sheet pile was utilized in Phase 1 to replace the bulkhead. It provided vital protection during Hurricane Sandy in 2012. Today, residents and visitors can still enjoy this waterfront area.

Location: Keyport, NJ

Project: Waterfront Revitalization Project – Phase I

Product: Sheet Piles

Overview: The Borough of Keyport wanted to transform the shoreline protection and public access. SUPERLOC Composite Sheet pile was utilized in Phase 1 to replace the bulkhead. It provided vital protection during Hurricane Sandy in 2012. Today, residents and visitors can still enjoy this waterfront area.